ITEM NO. |
CLIENT’S NAME |
WORK DESCRIPTION |
LOCATION |
START/STOP |
SCHEDUL E |
1. |
CHEVRON TERMINAL ESCRAVOS |
PROVISION OF OVER 175 LABOUR WORK FORCE FOR THE CONSTRUCTION OF BLOCK C |
ESCRAVOS |
2001 – 2003 |
– |
2. |
BOSKALIS WESTMINSTER INTERNATIONAL |
WASTE MANAGEMENT DURING THE SAND FILLING OF THE PRESENT ESCRAVOS GAS TO LIQUID PROJECT(EGTL) SITE |
ESCRAVOS |
MAY, 2002 –
MAY 2003 |
ON |
3. |
CHEVRON NIGERIA LIMITED (JOB No:25000089) |
CONSTRUCTION OF NALCO CHEMICAL BLENT PLANT |
ESCRAVOS |
2004-2005 |
– |
4. |
CHEVRON NIGERIA LIMITED (JOB NO: EGP-2008-CW601437 |
WATER TREATMENT PROJECT FOR CHEVRON NIGERIA LIMITED IN THE ESCRAVOS GAS TO PROJECT -3 (EGP-3) |
ESCRAVOS |
2007-2012 |
– |
5. |
HYUNDAI HEAVY INDUSTRIES (HHI)
JOB NO: WHHI-WM-0001 |
WASTE MANAGEMENT FOR HYUNDAI HEAVY INDUSTRIES (HHI) IN THE ESCRAVOS GAS PROJECT -3 (EGP -3) PROJECT |
ESCRAVOS |
NOV. 2006 –
DEC. 2010. |
– |
6. |
HYUNDAI HEAVY INDUSTRIES (HHI)
JOB NO: WHHI-WM-0001 |
OPERATION & MAINTENANCE OF ESITON SEWAGE TREATMENT PLANT FOR HYUNDAI HEAVY INDUSTRIES IN THE ESCRAVOS GAS PROJECT -3 (EGP – 3) PROJECT |
ESCRAVOS |
FEB. 2007 –
DEC. 2010 |
– |
7. |
SOUTHERN GAS CONSTRUCTORS (SGC)
JOB NO: 6093-ON-C39 |
CONSTRUCTION OF WASTE WATER TREATMENT PLANT |
ESCRAVOS |
OCT. 2007 |
ON |
8. |
SOUTHERN GAS CONSTRUCTORS (SGC)
JOB NO: 6093-ON-C74 |
OPERATION & MAINTENANCE OF ESITON WASTEWATER TREATMENT PLANT FOR SOUTHERN GAS CONSTRUCTORS IN THE ESCRAVOS GAS TO LIQUID PROJECT (EGTL) AND OPERATION AND MAINTENANCE OF THE MAIN CAMP SEWAGE TREATMENT PLANT |
ESCRAVOS |
DEC. 2007 TILL DATE |
ON |
9. |
CHEVRON NIGERIA LIMITED (JOB NO: 40088819) |
ELECTRICAL SCOPE FOR POWER PROJECT OF IKPERE PRIMARY SCHOOL, ARUNTON-UGBORODO |
UGBORODO |
2006 – 2007 |
– |
|
10. |
CHEVRON NIGERIA LIMITED |
CONSTRUCTION OF A 6” WELL WATER LINE AT CHEVRON NIGERIA LIMITED |
ESCRAVOS |
2009 |
– |
11. |
CHEVRON NIGERIA LIMITED |
CONSTRUCTION OF A 4” PVC SEWER PIPES AT CONSTRUCTION OF A 6” WELL WATER LINE AT CHEVRON NIGERIA LIMITED |
ESCRAVOS |
2010 |
– |
12 |
CHEVRON NEW WHARF NIGERIA LIMITED |
INSTALLATION OF 2 X 4 INCH TELECOM CONDUILTS AT CHEVRON NEW WHARF IN ESCRAVOS |
ESCRAVOS |
|
– |
13. |
TERMINAL CONTROL ROOM BUILDING JOB NO: JVO-2012- CW992566 |
REMODELING OF CHEVRON TERMINAL CONTROL ROOM |
ESCRAVOS |
2012-2014 |
– |